George Lucas’s museum will finally open September 22nd, 2026, following construction delays since breaking ground in March 2018, including COVID-19 pandemic setbacks. The 11-acre Los Angeles Exposition Park campus features a 300,000-square-foot building designed by Ma Yansong. The facility includes galleries, two theaters, a library, restaurant, café, retail store, and community areas. Lucas described the institution as “a temple to the people’s art” during his first San Diego Comic-Con appearance in July. The museum will house Lucas’s 40,000-piece collection, featuring works by Norman Rockwell, Frida Kahlo, Jack Kirby, and other notable artists. Lucas emphasized emotional connection over celebrity or cost, stating “If you have emotional connection, it’s art. If you don’t, just move on to the next painting.” The Lucas Archives will contain props, models, and costumes from his films. (Story URL)
Loading advertisement…
Win With The Groove
Upcoming Groove Events
World Soccer Championship Watch Parties @ Hotel Congress
Now - Wed, Jun 24 at 9:00pm
Hotel Congress
World Soccer Championship Watch Parties @ Hotel Congress
Thu, Jun 25 at 1:00pm
Hotel Congress
World Soccer Championship Watch Parties @ Hotel Congress
Fri, Jun 26 at 5:00pm
Hotel Congress
World Soccer Championship Watch Parties @ Hotel Congress
Sat, Jun 27 at 2:00pm
Hotel Congress
92.5 Urbana @ Curacao
Sat, Jun 27 at 3:00pm
Curacao


